Room additions, second stories, primary suites and garage additions. Designed, permitted and built by one team.
- Licensed General Contractor · CSLB #1141989
- In-house design and engineering
- Owner-managed: Sergei runs every project himself

An addition is never just a new room
The simplest addition is one room attached to the house, with nothing else to change. Most additions are not that simple, and a good contractor tells you so before the contract, not after demolition. When you add square footage, the house around it changes too:
HVAC
The existing system often cannot heat and cool the new space. It needs new ducts, a larger unit, or a separate zone.
Plumbing and sewer
A new bathroom means new supply lines, drains and a sewer connection that can handle the load.
Electrical
New circuits, and sometimes a panel upgrade.
Roof
Some additions tie into the existing roof. Others change the roof layout and the look of the whole house, so the new roof has to match the old one.
Outside
Many additions open to the yard with French doors, and need a deck, steps or a patio to step out onto.
Planned before you sign
We plan all of this in the design phase, so the price you sign covers the house you will actually get.

What we build
- Room additions: bedrooms, family rooms, home offices.
- Primary suite additions: bedroom, bathroom and walk-in closet.
- Second-story additions: new living space without losing yard.
- Garage additions: attached garages and garage expansions.
If it can be permitted and built, we can design and build it.
What does a home addition cost in San Diego?
$127 to $390 per square foot
That is the range of our completed home additions. The low end is a simple room on a flat lot, tied into the existing roof, with no plumbing. The high end includes a bathroom, HVAC upgrades, roof changes and high-end finishes.
What moves the price up
- A new bathroom or kitchenette (plumbing, sewer, ventilation)
- HVAC replacement or a new zone
- Roof layout changes
- Second-story structure (engineering, foundation checks)
- Coastal or hillside permit conditions
- Finish level
What keeps it down
- One room, no plumbing
- Simple roof tie-in
- Flat lot, standard permit
You get a fixed price after design and detailed questions. The “not included” list is short and written down.
How long it takes
1.5 to 3 months. Engineering takes the longest. Changes to the plan or scope add time.
A few weeks of plan check for a simple addition. Coastal zone or design review can add 3 to 6 months. HOA review can add more.
3 to 6 months. A simple addition with materials ordered in advance takes about 3 months. An addition that grows into a larger remodel takes longer.
We contact the city, the HOA and anyone else who can affect the schedule from the first week, so their questions come early, not in the middle of construction.
How it works
- Site visit. We walk the house and the lot, check the existing systems and tell you what the addition will really involve.
- Design and engineering. In-house architecture, structural engineering and Title 24 energy calculations.
- Fixed price. One written price before construction.
- Permits. We submit to the City, the County or your city, and handle plan check corrections, HOA and coastal requirements.
- Construction. Sergei manages the site from foundation to final inspection.
- Final walkthrough. We check every detail with you. Warranty: 1 year workmanship, 10 years structural.

Recent additions

Escondido · Addition and remodel

San Diego · Room addition

San Marcos · Primary suite addition
Renovation and addition, San Diego · Full home renovation, San Marcos Lake
Questions about home additions
How much does a room addition cost in San Diego?
Our additions have ranged from $127 to $390 per square foot. The final number depends on plumbing, HVAC, roof changes and finishes. We give a fixed price after design.
How long does an addition take?
Construction takes 3 to 6 months. Our fastest addition took 3 months: a simple scope, with all materials ordered before we started. Our longest took 6.5 months, because the owners decided mid-project to remodel the whole house, including new ceiling shapes. Design takes about 1.5 to 3 months, and permits from a few weeks to several months, depending on the city and the scope.
Do I need a permit for a home addition?
Yes. Every addition needs a building permit. We prepare and submit all drawings and handle plan check and inspections.
Will my HVAC system handle the new space?
Often it will not. We check the existing system on the first visit and include any upgrade in the price.
Can you match the new roof to my existing house?
Yes. Roof design is part of our drawings, so the addition looks like it was always part of the house.
Do you build in coastal areas like Del Mar, La Jolla and Encinitas?
Yes. Coastal zone projects can need a Coastal Development Permit in addition to the building permit. We identify this at the start.
Tell us about your house
We visit, look at the existing systems and tell you what your addition will really involve.